[1]
|
M. Afzalirad and M. Shafipour, Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions, Journal Of Intelligent Manufacturing, 29 (2018), 423-437.
doi: 10.1007/s10845-015-1117-6.
|
[2]
|
E. Akyol Ozer and T. Sarac, MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints, TOP, 27 (2019), 94-124.
doi: 10.1007/s11750-018-00494-x.
|
[3]
|
O. Alagoz and M. Azizoglu, Rescheduling of identical parallel machines under machine eligibility constraints, European Journal of Operational Research, 149 (2003), 523-532.
doi: 10.1016/S0377-2217(02)00499-X.
|
[4]
|
A. Baykasoglu and F. Ozsoydan, Dynamic scheduling of parallel heat treatment furnaces: A case study at a manufacturing system, Journal of Manufacturing Systems, 46 (2018), 152-162.
doi: 10.1016/j.jmsy.2017.12.005.
|
[5]
|
G. Bektur and T. Sarac, A Mathematical Model and Heuristic Algorithms for an Unrelated Parallel Machine Scheduling Problem with Sequence-Dependent Setup Times, Machine Eligibility Restrictions and a Common Server, Computers & Operations Research, 103 (2019), 46-63.
doi: 10.1016/j.cor.2018.10.010.
|
[6]
|
I. A. Chaudhry and P. R. Drake, Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms, International Journal of Advanced Manufacturing Technology, 42 (2009), 581-594.
doi: 10.1007/s00170-008-1617-z.
|
[7]
|
S. G. Dastidar and R. Nagi, Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs, Computers & Operations Research, 32 (2005), 2987-3005.
doi: 10.1016/j.cor.2004.04.012.
|
[8]
|
R. Driessel and L. Moench, Scheduling jobs on parallel machines with sequence dependent setup times precedence constraints and ready times using variable neighborhood search, International Conference on Computers and Industrial Engineering, (2009), 273–278.
doi: 10.1109/ICCIE.2009.5223515.
|
[9]
|
E. B. Edis and C. Oguz, Parallel machine scheduling with flexible resources, Computers & Industrial Engineering, 63 (2012), 433-447.
doi: 10.1016/j.cie.2012.03.018.
|
[10]
|
E.B. Edis and I. Ozkarahan, A combined integer/constraint programming approach to a resource constrained parallel machine scheduling problem with machine eligibility restrictions, Engineering Optimization, 43 (2011), 135-157.
doi: 10.1080/03052151003759117.
|
[11]
|
E. B. Edis and I. Ozkarahan, Solution approaches for a real-life resource-constrained parallel machine scheduling problem, International Journal of Advanced Manufacturing Technology, 58 (2012), 1141-1153.
doi: 10.1007/s00170-011-3454-8.
|
[12]
|
A. Ezugwu and F. Akutsah, An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times, IEEE ACCESS, 6 (2018), 54459-54478.
doi: 10.1109/ACCESS.2018.2872110.
|
[13]
|
B. Gacias, C. Artigues and P. Lopez, Parallel machine scheduling with precedence constraints and setup times, Computers & Operations Research, 37 (2010), 2141-2151.
doi: 10.1016/j.cor.2010.03.003.
|
[14]
|
R. Gokhale and M. Mathirajan, Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flow time in automobile gear manufacturing, International Journal of Advanced Manufacturing Technology, 60 (2012), 1099-1110.
|
[15]
|
T. Keskinturk, M. B. Yildirim and M. Barut, An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times, Computers & Operations Research, 39 (2012), 1225-1235.
doi: 10.1016/j.cor.2010.12.003.
|
[16]
|
K. Li, Y. Shia, S. Yanga and B. Cheng, Parallel machine scheduling problem to minimize the makespan with resource dependent processing times, Applied Soft Computing, 11 (2011), 5551-5557.
doi: 10.1016/j.asoc.2011.05.005.
|
[17]
|
X. Li, H. Chehade, F. Yalaoui and L. Amodeo, Fuzzy logic controller based multi-objective meta-heuristics to solve parallel machines scheduling problem, Journal of Multiple-Valued Logic and Soft Computing, 18 (2012), 617-636.
|
[18]
|
S. W. Lin, Z. J. Lee, K. C. Ying and C. C. Lu, Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates, Computers & Operations Research, 38 (2011), 809-815.
doi: 10.1016/j.cor.2010.09.020.
|
[19]
|
M. Liu and C. Wu, Scheduling algorithm based on evolutionary computing in identical parallel machine production line, Robotics and Computer Integrated Manufacturing, 19 (2003), 401-407.
doi: 10.1016/S0736-5845(03)00041-3.
|
[20]
|
T. Park, T. Lee and C. O. Kim, Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times, International Journal of Advanced Manufacturing Technology, 59 (2012), 325-333.
doi: 10.1007/s00170-011-3489-x.
|
[21]
|
R. Ruiz and C. A. Romano, Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times, International Journal of Advanced Manufacturing Technology, 57 (2011), 777-794.
doi: 10.1007/s00170-011-3318-2.
|
[22]
|
T. Sarac and A. Sipahioglu, Plastik enjeksiyon makinalarinin Çizelgelenmesi problemi, Journal of Industrial Engineering, 20 (2009), 2-14.
|
[23]
|
L. Su, W. Y. Chang and F. D. Chou, Minimizing maximum lateness on identical parallel machines with flexible resources and machine eligibility constraints, International Journal of Advanced Manufacturing Technology, 56 (2011), 1195.
doi: 10.1007/s00170-011-3236-3.
|
[24]
|
I. T. Tanev, T. Uozumi and Y. Morotome, Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: Application service provider approach, Applied Soft Computing, 5 (2004), 87-100.
doi: 10.1016/j.asoc.2004.03.013.
|
[25]
|
A. K. Turker and C. Sel, A Hybrid approach on single server parallel machines scheduling problem with sequence dependent setup times, Journal of the Faculty of Engineering and Architecture of Gazi University, 26 (2011), 731-740.
|
[26]
|
Y. Unlu and S. J. Mason, Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems, Computers & Industrial Engineering, 58 (2010), 785-800.
doi: 10.1016/j.cie.2010.02.012.
|