
-
Previous Article
Optimal pricing and advertising decisions with suppliers' oligopoly competition: Stakelberg-Nash game structures
- JIMO Home
- This Issue
-
Next Article
Time-consistent strategy for a multi-period mean-variance asset-liability management problem with stochastic interest rate
Machine interference problem involving unsuccessful switchover for a group of repairable servers with vacations
Department of Applied Statistics, National Taichung University of Science and Technology, Taichung, Taiwan |
The purpose of this paper is to explore the multiple-server machine interference problem with standby unsuccessful switchover and Bernoulli vacation schedule. Failure times of operating and standby machines are assumed to have exponential distributions and repair times of the failed machines and vacation times of servers are also assumed to have exponential distributions. After the completion of service, the server either goes for a vacation or may continue serving for the next machine. The vacation policy we considered is a single vacation policy. In practice, the switchover may experience a significant failure. The matrix analytical method and recursive method are employed to obtain the steady-state probability vectors, and closed-form expressions of some important system characteristics are obtained. The problem of cost optimization dealt with a number of numerical examples is provided by the Quasi-Newton method, the pattern search method, and the Nelder-Mead simplex direct search method. Expressions of various system characteristics are derived. Sensitivity analysis is performed numerically for system parameters. This paper presents the first time that machine interference problem with unsuccessful switchover for a group of repairable servers with vacations has been obtained, which is quite useful for the decision makers.
References:
[1] |
W. L. Chen and K. H. Wang,
Reliability analysis of a retrial machine repair problem with warm standbys and a single server with N-policy, Reliability Engineering & System Safety, 180 (2018), 476-486.
doi: 10.1016/j.ress.2018.08.011. |
[2] |
G. Choudhury and J. C. Ke,
An unreliable retrial queue with delaying repair and general retrial times under Bernoulli vacation schedule, Applied Mathematics and Computation, 230 (2014), 436-450.
doi: 10.1016/j.amc.2013.12.108. |
[3] |
S. M. Gupta,
Machine interference problem with warm spares, server vacations and exhaustive service, Performance Evaluation, 29 (1997), 195-211.
doi: 10.1016/S0166-5316(96)00046-6. |
[4] |
G. He, W. Wu and Y. Zhang,
Performance analysis of machine repair system with single working vacation, Communications in Statistics – Theory and Methods, 48 (2019), 5602-5620.
doi: 10.1080/03610926.2018.1515958. |
[5] |
Y. L. Hsu, J. C. Ke and T. H. Liu,
Standby system with general repair, reboot delay, switching failure and unreliable repair facility – A statistical standpoint, Mathematics and Computers in Simulation, 81 (2011), 2400-2413.
doi: 10.1016/j.matcom.2011.03.003. |
[6] |
Y. L. Hsu, J. C. Ke, T. H. Liu and C. H. Wu,
Modeling of multi-server repair problem with switching failure and reboot delay and related profit analysis, Computers & Industrial Engineering, 69 (2014), 21-28.
doi: 10.1016/j.cie.2013.12.003. |
[7] |
H. I. Huang, C. H. Lin and J. C. Ke,
Parametric nonlinear programming approach for a repairable system with switching failure and fuzzy parameters, Applied Mathematics and Computation, 183 (2006), 508-517.
doi: 10.1016/j.amc.2006.05.119. |
[8] |
J. B. Ke, J. W. Chen and K. H. Wang,
Reliability measures of a repairable system with standby switching failures and reboot delay, Quality Technology and Quantitative Managementl, 8 (2011), 15-26.
doi: 10.1080/16843703.2011.11673243. |
[9] |
J. B. Ke, W. C. Lee and J. C. Ke,
Reliability-based measure for a system with standbys subjected to switching failures, Engineering Computations, 25 (2008), 694-706.
doi: 10.1108/02644400810899979. |
[10] |
J. C. Ke, K. B. Huang and W. L. Pearn,
A batch arrival queue under randomized multi-vacation policy with unreliable server and repair, International Journal of Systems Science, 43 (2012), 552-565.
doi: 10.1080/00207721.2010.517863. |
[11] |
J. C. Ke, S. L. Lee and C. H. Liou,
Machine repair problem in production systems with spares and server vacations, RAIRO Operation Research, 43 (2009), 35-54.
doi: 10.1051/ro/2009004. |
[12] |
J. C. Ke, T. H. Liu and D. Y. Yang,
Machine repairing systems with standby switching failure, Computers & Industrial Engineering, 99 (2016), 223-228.
doi: 10.1016/j.cie.2016.07.016. |
[13] |
J. C. Ke, T. H. Liu and D. Y. Yang,
Modeling of machine interference problem with unreliable repairman and standbys imperfect switchover, Reliability Engineering & System Safety, 174 (2018), 12-18.
doi: 10.1016/j.ress.2018.01.013. |
[14] |
J. C. Ke and K. H. Wang,
Vacation policies for machine repair problem with two type spares, Applied Mathematical Modelling, 31 (2007), 880-894.
doi: 10.1016/j.apm.2006.02.009. |
[15] |
J. C. Ke and C. H. Wu,
Multi-server machine repair model with standbys and synchronous multiple vacation, Computers & Industrial Engineering, 62 (2012), 296-305.
doi: 10.1016/j.cie.2011.09.017. |
[16] |
B. Keren, G. Gurevich and Y. Hadad,
Machines interference problem with several operatiors and several service types that have different priorities, International Journal of Operational Research, 30 (2017), 289-320.
doi: 10.1504/IJOR.2017.087274. |
[17] |
K. Kumar, M. Jain and C. Shekhar,
Machine repair system with F-policy, two unreliable servers, and warm standbys, Journal of Testing and Evaluation, 47 (2019), 361-383.
doi: 10.1520/JTE20160595. |
[18] |
C. C. Kuo and J. C. Ke,
Comparative analysis of standby systems with unreliable server and switching failure, Reliability Engineering and System Safety, 145 (2016), 74-82.
doi: 10.1016/j.ress.2015.09.001. |
[19] |
Y. Lee,
Availability analysis of redundancy model with generally distributed repair time, imperfect switchover and interrupted repair, Electronics Letters, 52 (2016), 1851-1853.
doi: 10.1049/el.2016.2114. |
[20] |
E. E. Lewis, Introduction to Reliability Engineering, John Wiley & Sons, Inc., New York, 1987. |
[21] |
T. H. Liu, J. C. Ke, Y. L. Hsu and Y. L. Hsu,
Bootstrapping computation of availability for a repairable system with standby subject to imperfect switching, Communications in statistics – Simulation and Computation, 40 (2011), 469-483.
doi: 10.1080/03610918.2010.546539. |
[22] |
S. Maheshwari, R. Supriya and M. Jain, Machine repair problem with K-type warm spares, multiple vacation for repairman and reneging, International Journal of Engineering and Technology, 2 (2010), 252-258. Google Scholar |
[23] |
S. J. Sadjadi and R. Soltani, Minimum-Maximum regret redundancy allocation with the choice of redundancy strategy and multiple choice of component type under uncertainty, Computers & Industrial Engineering, 79 (2015), 204-213. Google Scholar |
[24] |
C. Shekhar, M. Jain, A. Raina and R. Mishra,
Sensitivity analysis of repairable redundant system with switching failure and geometric reneging, Decision Science Letters, 6 (2017), 337-350.
doi: 10.5267/j.dsl.2017.2.004. |
[25] |
R. K. Shrivastava and A. K. Mishra,
Analysis of queueing model for machine repairing system with Bernoulli vacation schedule, International Journal of Mathematics Trends and Technology, 10 (2014), 85-92.
doi: 10.14445/22315373/IJMTT-V10P514. |
[26] |
S. R. Srinivas,
A multi-server synchronous vacation model with thresholds and a probabilistic decision rule, European Journal of Operational Research, 182 (2007), 305-320.
doi: 10.1016/j.ejor.2006.07.037. |
[27] |
K. H. Wang, W. L. Chen and D. Y. Yang,
Optimal management of the machine repair problem with working vacation: Newton's method, Journal of Computational and Applied Mathematics, 233 (2009), 449-458.
doi: 10.1016/j.cam.2009.07.043. |
[28] |
K. H. Wang, W. L. Dong and J. B. Ke,
Comparison of reliability and the availability between four systems with standby components and standby switching failure, Applied Mathematics and Computation, 183 (2006), 1310-1322.
doi: 10.1016/j.amc.2006.05.161. |
[29] |
K. H. Wang, T. C. Yen and J. Y. Chen,
Optimization analysis of retrial machine repair problem with server breakdown and threshold recovery policy, Journal of Testing and Evaluation, 46 (2018), 2630-2640.
doi: 10.1520/JTE20160149. |
[30] |
C. H. Wu and J. C. Ke,
Multi-server machine repair problems under a (V, R) synchronous single vacation policy, Applied Mathematical Modelling, 38 (2014), 2180-2189.
doi: 10.1016/j.apm.2013.10.045. |
[31] |
D. Y. Yang and Y. D. Chang,
Sensitivity analysis of the machine repair problem with general repeated attempts, International Journal of Computer Mathematics, 95 (2018), 1761-1774.
doi: 10.1080/00207160.2017.1336230. |
[32] |
D. Yue, W. Yue and Y. Sun, Performance analysis of an M/M/c/N queueing system with balking, reneging and synchronous vacations of partial servers, The Sixth International Symposium on Operations Research and Its Applications (ISORA–06), (2006), 128–143. Google Scholar |
show all references
References:
[1] |
W. L. Chen and K. H. Wang,
Reliability analysis of a retrial machine repair problem with warm standbys and a single server with N-policy, Reliability Engineering & System Safety, 180 (2018), 476-486.
doi: 10.1016/j.ress.2018.08.011. |
[2] |
G. Choudhury and J. C. Ke,
An unreliable retrial queue with delaying repair and general retrial times under Bernoulli vacation schedule, Applied Mathematics and Computation, 230 (2014), 436-450.
doi: 10.1016/j.amc.2013.12.108. |
[3] |
S. M. Gupta,
Machine interference problem with warm spares, server vacations and exhaustive service, Performance Evaluation, 29 (1997), 195-211.
doi: 10.1016/S0166-5316(96)00046-6. |
[4] |
G. He, W. Wu and Y. Zhang,
Performance analysis of machine repair system with single working vacation, Communications in Statistics – Theory and Methods, 48 (2019), 5602-5620.
doi: 10.1080/03610926.2018.1515958. |
[5] |
Y. L. Hsu, J. C. Ke and T. H. Liu,
Standby system with general repair, reboot delay, switching failure and unreliable repair facility – A statistical standpoint, Mathematics and Computers in Simulation, 81 (2011), 2400-2413.
doi: 10.1016/j.matcom.2011.03.003. |
[6] |
Y. L. Hsu, J. C. Ke, T. H. Liu and C. H. Wu,
Modeling of multi-server repair problem with switching failure and reboot delay and related profit analysis, Computers & Industrial Engineering, 69 (2014), 21-28.
doi: 10.1016/j.cie.2013.12.003. |
[7] |
H. I. Huang, C. H. Lin and J. C. Ke,
Parametric nonlinear programming approach for a repairable system with switching failure and fuzzy parameters, Applied Mathematics and Computation, 183 (2006), 508-517.
doi: 10.1016/j.amc.2006.05.119. |
[8] |
J. B. Ke, J. W. Chen and K. H. Wang,
Reliability measures of a repairable system with standby switching failures and reboot delay, Quality Technology and Quantitative Managementl, 8 (2011), 15-26.
doi: 10.1080/16843703.2011.11673243. |
[9] |
J. B. Ke, W. C. Lee and J. C. Ke,
Reliability-based measure for a system with standbys subjected to switching failures, Engineering Computations, 25 (2008), 694-706.
doi: 10.1108/02644400810899979. |
[10] |
J. C. Ke, K. B. Huang and W. L. Pearn,
A batch arrival queue under randomized multi-vacation policy with unreliable server and repair, International Journal of Systems Science, 43 (2012), 552-565.
doi: 10.1080/00207721.2010.517863. |
[11] |
J. C. Ke, S. L. Lee and C. H. Liou,
Machine repair problem in production systems with spares and server vacations, RAIRO Operation Research, 43 (2009), 35-54.
doi: 10.1051/ro/2009004. |
[12] |
J. C. Ke, T. H. Liu and D. Y. Yang,
Machine repairing systems with standby switching failure, Computers & Industrial Engineering, 99 (2016), 223-228.
doi: 10.1016/j.cie.2016.07.016. |
[13] |
J. C. Ke, T. H. Liu and D. Y. Yang,
Modeling of machine interference problem with unreliable repairman and standbys imperfect switchover, Reliability Engineering & System Safety, 174 (2018), 12-18.
doi: 10.1016/j.ress.2018.01.013. |
[14] |
J. C. Ke and K. H. Wang,
Vacation policies for machine repair problem with two type spares, Applied Mathematical Modelling, 31 (2007), 880-894.
doi: 10.1016/j.apm.2006.02.009. |
[15] |
J. C. Ke and C. H. Wu,
Multi-server machine repair model with standbys and synchronous multiple vacation, Computers & Industrial Engineering, 62 (2012), 296-305.
doi: 10.1016/j.cie.2011.09.017. |
[16] |
B. Keren, G. Gurevich and Y. Hadad,
Machines interference problem with several operatiors and several service types that have different priorities, International Journal of Operational Research, 30 (2017), 289-320.
doi: 10.1504/IJOR.2017.087274. |
[17] |
K. Kumar, M. Jain and C. Shekhar,
Machine repair system with F-policy, two unreliable servers, and warm standbys, Journal of Testing and Evaluation, 47 (2019), 361-383.
doi: 10.1520/JTE20160595. |
[18] |
C. C. Kuo and J. C. Ke,
Comparative analysis of standby systems with unreliable server and switching failure, Reliability Engineering and System Safety, 145 (2016), 74-82.
doi: 10.1016/j.ress.2015.09.001. |
[19] |
Y. Lee,
Availability analysis of redundancy model with generally distributed repair time, imperfect switchover and interrupted repair, Electronics Letters, 52 (2016), 1851-1853.
doi: 10.1049/el.2016.2114. |
[20] |
E. E. Lewis, Introduction to Reliability Engineering, John Wiley & Sons, Inc., New York, 1987. |
[21] |
T. H. Liu, J. C. Ke, Y. L. Hsu and Y. L. Hsu,
Bootstrapping computation of availability for a repairable system with standby subject to imperfect switching, Communications in statistics – Simulation and Computation, 40 (2011), 469-483.
doi: 10.1080/03610918.2010.546539. |
[22] |
S. Maheshwari, R. Supriya and M. Jain, Machine repair problem with K-type warm spares, multiple vacation for repairman and reneging, International Journal of Engineering and Technology, 2 (2010), 252-258. Google Scholar |
[23] |
S. J. Sadjadi and R. Soltani, Minimum-Maximum regret redundancy allocation with the choice of redundancy strategy and multiple choice of component type under uncertainty, Computers & Industrial Engineering, 79 (2015), 204-213. Google Scholar |
[24] |
C. Shekhar, M. Jain, A. Raina and R. Mishra,
Sensitivity analysis of repairable redundant system with switching failure and geometric reneging, Decision Science Letters, 6 (2017), 337-350.
doi: 10.5267/j.dsl.2017.2.004. |
[25] |
R. K. Shrivastava and A. K. Mishra,
Analysis of queueing model for machine repairing system with Bernoulli vacation schedule, International Journal of Mathematics Trends and Technology, 10 (2014), 85-92.
doi: 10.14445/22315373/IJMTT-V10P514. |
[26] |
S. R. Srinivas,
A multi-server synchronous vacation model with thresholds and a probabilistic decision rule, European Journal of Operational Research, 182 (2007), 305-320.
doi: 10.1016/j.ejor.2006.07.037. |
[27] |
K. H. Wang, W. L. Chen and D. Y. Yang,
Optimal management of the machine repair problem with working vacation: Newton's method, Journal of Computational and Applied Mathematics, 233 (2009), 449-458.
doi: 10.1016/j.cam.2009.07.043. |
[28] |
K. H. Wang, W. L. Dong and J. B. Ke,
Comparison of reliability and the availability between four systems with standby components and standby switching failure, Applied Mathematics and Computation, 183 (2006), 1310-1322.
doi: 10.1016/j.amc.2006.05.161. |
[29] |
K. H. Wang, T. C. Yen and J. Y. Chen,
Optimization analysis of retrial machine repair problem with server breakdown and threshold recovery policy, Journal of Testing and Evaluation, 46 (2018), 2630-2640.
doi: 10.1520/JTE20160149. |
[30] |
C. H. Wu and J. C. Ke,
Multi-server machine repair problems under a (V, R) synchronous single vacation policy, Applied Mathematical Modelling, 38 (2014), 2180-2189.
doi: 10.1016/j.apm.2013.10.045. |
[31] |
D. Y. Yang and Y. D. Chang,
Sensitivity analysis of the machine repair problem with general repeated attempts, International Journal of Computer Mathematics, 95 (2018), 1761-1774.
doi: 10.1080/00207160.2017.1336230. |
[32] |
D. Yue, W. Yue and Y. Sun, Performance analysis of an M/M/c/N queueing system with balking, reneging and synchronous vacations of partial servers, The Sixth International Symposium on Operations Research and Its Applications (ISORA–06), (2006), 128–143. Google Scholar |

(1, 1) | (1, 2) | (1, 3) | (1, 4) | (1, 5) | (1, 6) | (1, 7) | (1, 8) | |
99.72 | 98.43 | 99.20 | 100.74 | 102.52 | 104.32 | 106.04 | 107.65 | |
(1, 9) | (1, 10) | (1, 11) | (1, 12) | (2, 1) | (2, 2) | (2, 3) | (2, 4) | |
109.13 | 110.49 | 111.74 | 112.88 | 92.32 | 92.45 | 94.40 | ||
(2, 5) | (2, 6) | (2, 7) | (2, 8) | (2, 9) | (2, 10) | (2, 11) | (2, 12) | |
96.70 | 98.92 | 100.97 | 102.83 | 104.51 | 106.02 | 107.39 | 108.62 | |
(3, 1) | (3, 2) | (3, 3) | (3, 4) | (3, 5) | (3, 6) | (3, 7) | (3, 8) | |
97.43 | 94.99 | 96.04 | 97.96 | 100.03 | 102.00 | 103.83 | 105.47 | |
(3, 9) | (3, 10) | (3, 11) | (3, 12) | (4, 1) | (4, 2) | (4, 3) | (4, 4) | |
106.95 | 108.28 | 109.46 | 110.53 | 98.44 | 96.39 | 97.75 | 99.94 | |
(4, 5) | (4, 6) | (4, 7) | (4, 8) | (4, 9) | (4, 10) | (4, 11) | (4, 12) | |
102.17 | 104.22 | 106.04 | 107.65 | 109.07 | 110.33 | 111.45 | 112.44 | |
(5, 9) | (5, 10) | (5, 11) | (5, 12) | (6, 1) | (6, 2) | (6, 3) | (6, 4) | |
109.33 | 110.60 | 111.72 | 112.72 | 95.48 | 94.17 | 96.15 | 98.83 | |
(6, 5) | (6, 6) | (6, 7) | (6, 8) | (6, 9) | (6, 10) | (6, 11) | (6, 12) | |
101.39 | 103.66 | 105.63 | 107.35 | 108.84 | 110.16 | 111.33 | 112.37 | |
(7, 2) | (7, 3) | (7, 4) | (7, 5) | (7, 6) | (7, 7) | (7, 8) | (7, 9) | |
91.92 | 94.27 | 97.24 | 100.01 | 102.43 | 104.53 | 106.35 | 107.93 | |
(7, 10) | (7, 11) | (7, 12) | (8, 3) | (8, 4) | (8, 5) | (8, 6) | (8, 7) | |
109.32 | 110.54 | 111.64 | 91.97 | 95.24 | 98.25 | 100.85 | 103.10 | |
(8, 8) | (8, 9) | (8, 10) | (8, 11) | (8, 12) | (9, 4) | (9, 5) | (9, 6) | |
105.03 | 106.71 | 108.19 | 109.49 | 110.65 | 92.94 | 96.20 | 99.01 | |
(9, 7) | (9, 8) | (9, 9) | (9, 10) | (9, 11) | (9, 12) | (10, 5) | (10, 6) | |
101.41 | 103.48 | 105.28 | 106.85 | 108.24 | 109.48 | 93.93 | 96.95 | |
(10, 7) | (10, 8) | (10, 9) | (10, 10) | (10, 11) | (10, 12) | (11, 6) | (11, 7) | |
99.53 | 101.75 | 103.67 | 105.36 | 106.84 | 108.16 | 94.73 | 97.49 | |
(11, 8) | (11, 9) | (11, 10) | (11, 11) | (11, 12) | (12, 7) | (12, 8) | (12, 9) | |
99.87 | 101.92 | 103.72 | 105.31 | 106.71 | 95.32 | 97.86 | 100.06 | |
(12, 10) | (12, 11) | (12, 12) | ||||||
101.98 | 103.67 | 105.17 |
(1, 1) | (1, 2) | (1, 3) | (1, 4) | (1, 5) | (1, 6) | (1, 7) | (1, 8) | |
99.72 | 98.43 | 99.20 | 100.74 | 102.52 | 104.32 | 106.04 | 107.65 | |
(1, 9) | (1, 10) | (1, 11) | (1, 12) | (2, 1) | (2, 2) | (2, 3) | (2, 4) | |
109.13 | 110.49 | 111.74 | 112.88 | 92.32 | 92.45 | 94.40 | ||
(2, 5) | (2, 6) | (2, 7) | (2, 8) | (2, 9) | (2, 10) | (2, 11) | (2, 12) | |
96.70 | 98.92 | 100.97 | 102.83 | 104.51 | 106.02 | 107.39 | 108.62 | |
(3, 1) | (3, 2) | (3, 3) | (3, 4) | (3, 5) | (3, 6) | (3, 7) | (3, 8) | |
97.43 | 94.99 | 96.04 | 97.96 | 100.03 | 102.00 | 103.83 | 105.47 | |
(3, 9) | (3, 10) | (3, 11) | (3, 12) | (4, 1) | (4, 2) | (4, 3) | (4, 4) | |
106.95 | 108.28 | 109.46 | 110.53 | 98.44 | 96.39 | 97.75 | 99.94 | |
(4, 5) | (4, 6) | (4, 7) | (4, 8) | (4, 9) | (4, 10) | (4, 11) | (4, 12) | |
102.17 | 104.22 | 106.04 | 107.65 | 109.07 | 110.33 | 111.45 | 112.44 | |
(5, 9) | (5, 10) | (5, 11) | (5, 12) | (6, 1) | (6, 2) | (6, 3) | (6, 4) | |
109.33 | 110.60 | 111.72 | 112.72 | 95.48 | 94.17 | 96.15 | 98.83 | |
(6, 5) | (6, 6) | (6, 7) | (6, 8) | (6, 9) | (6, 10) | (6, 11) | (6, 12) | |
101.39 | 103.66 | 105.63 | 107.35 | 108.84 | 110.16 | 111.33 | 112.37 | |
(7, 2) | (7, 3) | (7, 4) | (7, 5) | (7, 6) | (7, 7) | (7, 8) | (7, 9) | |
91.92 | 94.27 | 97.24 | 100.01 | 102.43 | 104.53 | 106.35 | 107.93 | |
(7, 10) | (7, 11) | (7, 12) | (8, 3) | (8, 4) | (8, 5) | (8, 6) | (8, 7) | |
109.32 | 110.54 | 111.64 | 91.97 | 95.24 | 98.25 | 100.85 | 103.10 | |
(8, 8) | (8, 9) | (8, 10) | (8, 11) | (8, 12) | (9, 4) | (9, 5) | (9, 6) | |
105.03 | 106.71 | 108.19 | 109.49 | 110.65 | 92.94 | 96.20 | 99.01 | |
(9, 7) | (9, 8) | (9, 9) | (9, 10) | (9, 11) | (9, 12) | (10, 5) | (10, 6) | |
101.41 | 103.48 | 105.28 | 106.85 | 108.24 | 109.48 | 93.93 | 96.95 | |
(10, 7) | (10, 8) | (10, 9) | (10, 10) | (10, 11) | (10, 12) | (11, 6) | (11, 7) | |
99.53 | 101.75 | 103.67 | 105.36 | 106.84 | 108.16 | 94.73 | 97.49 | |
(11, 8) | (11, 9) | (11, 10) | (11, 11) | (11, 12) | (12, 7) | (12, 8) | (12, 9) | |
99.87 | 101.92 | 103.72 | 105.31 | 106.71 | 95.32 | 97.86 | 100.06 | |
(12, 10) | (12, 11) | (12, 12) | ||||||
101.98 | 103.67 | 105.17 |
QN method | |||
0.2 | 0.4 | 0.6 | |
68.34 | 85.47 | 95.95 | |
(1, 1) | (2, 2) | (2, 2) | |
(2.37, 5.43) | (2.38, 2.14) | (3.09, 4.09) | |
Iterations | 1204 | 1427 | 1583 |
CPU Time | 6.26 | 5.62 | 5.64 |
MN method | |||
68.34 | 85.47 | 95.95 | |
(1, 1) | (2, 2) | (2, 2) | |
(2.37, 5.43) | (2.38, 2.14) | (3.09, 4.09) | |
Iterations | 6741 | 6074 | 6176 |
CPU Time | 6.39 | 5.77 | 5.62 |
PS method | |||
68.34 | 85.47 | 95.95 | |
(1, 1) | (2, 2) | (2, 2) | |
(2.37, 5.43) | (2.38, 2.14) | (3.09, 4.09) | |
Iterations | 11679 | 13179 | 13294 |
CPU Time | 22.44 | 23.57 | 25.80 |
QN method | |||
0.2 | 0.4 | 0.6 | |
68.34 | 85.47 | 95.95 | |
(1, 1) | (2, 2) | (2, 2) | |
(2.37, 5.43) | (2.38, 2.14) | (3.09, 4.09) | |
Iterations | 1204 | 1427 | 1583 |
CPU Time | 6.26 | 5.62 | 5.64 |
MN method | |||
68.34 | 85.47 | 95.95 | |
(1, 1) | (2, 2) | (2, 2) | |
(2.37, 5.43) | (2.38, 2.14) | (3.09, 4.09) | |
Iterations | 6741 | 6074 | 6176 |
CPU Time | 6.39 | 5.77 | 5.62 |
PS method | |||
68.34 | 85.47 | 95.95 | |
(1, 1) | (2, 2) | (2, 2) | |
(2.37, 5.43) | (2.38, 2.14) | (3.09, 4.09) | |
Iterations | 11679 | 13179 | 13294 |
CPU Time | 22.44 | 23.57 | 25.80 |
[1] |
Min Li. A three term Polak-Ribière-Polyak conjugate gradient method close to the memoryless BFGS quasi-Newton method. Journal of Industrial & Management Optimization, 2020, 16 (1) : 245-260. doi: 10.3934/jimo.2018149 |
[2] |
Armin Lechleiter, Tobias Rienmüller. Factorization method for the inverse Stokes problem. Inverse Problems & Imaging, 2013, 7 (4) : 1271-1293. doi: 10.3934/ipi.2013.7.1271 |
[3] |
Marion Darbas, Jérémy Heleine, Stephanie Lohrengel. Numerical resolution by the quasi-reversibility method of a data completion problem for Maxwell's equations. Inverse Problems & Imaging, 2020, 14 (6) : 1107-1133. doi: 10.3934/ipi.2020056 |
[4] |
Qiang Guo, Dong Liang. An adaptive wavelet method and its analysis for parabolic equations. Numerical Algebra, Control & Optimization, 2013, 3 (2) : 327-345. doi: 10.3934/naco.2013.3.327 |
[5] |
Tao Wu, Yu Lei, Jiao Shi, Maoguo Gong. An evolutionary multiobjective method for low-rank and sparse matrix decomposition. Big Data & Information Analytics, 2017, 2 (1) : 23-37. doi: 10.3934/bdia.2017006 |
[6] |
Deren Han, Zehui Jia, Yongzhong Song, David Z. W. Wang. An efficient projection method for nonlinear inverse problems with sparsity constraints. Inverse Problems & Imaging, 2016, 10 (3) : 689-709. doi: 10.3934/ipi.2016017 |
[7] |
Boris Kramer, John R. Singler. A POD projection method for large-scale algebraic Riccati equations. Numerical Algebra, Control & Optimization, 2016, 6 (4) : 413-435. doi: 10.3934/naco.2016018 |
[8] |
Petra Csomós, Hermann Mena. Fourier-splitting method for solving hyperbolic LQR problems. Numerical Algebra, Control & Optimization, 2018, 8 (1) : 17-46. doi: 10.3934/naco.2018002 |
[9] |
Christina Surulescu, Nicolae Surulescu. Modeling and simulation of some cell dispersion problems by a nonparametric method. Mathematical Biosciences & Engineering, 2011, 8 (2) : 263-277. doi: 10.3934/mbe.2011.8.263 |
[10] |
Jiangxing Wang. Convergence analysis of an accurate and efficient method for nonlinear Maxwell's equations. Discrete & Continuous Dynamical Systems - B, 2021, 26 (5) : 2429-2440. doi: 10.3934/dcdsb.2020185 |
[11] |
Manfred Einsiedler, Elon Lindenstrauss. On measures invariant under diagonalizable actions: the Rank-One case and the general Low-Entropy method. Journal of Modern Dynamics, 2008, 2 (1) : 83-128. doi: 10.3934/jmd.2008.2.83 |
[12] |
Xiaomao Deng, Xiao-Chuan Cai, Jun Zou. A parallel space-time domain decomposition method for unsteady source inversion problems. Inverse Problems & Imaging, 2015, 9 (4) : 1069-1091. doi: 10.3934/ipi.2015.9.1069 |
[13] |
Mohsen Abdolhosseinzadeh, Mir Mohammad Alipour. Design of experiment for tuning parameters of an ant colony optimization method for the constrained shortest Hamiltonian path problem in the grid networks. Numerical Algebra, Control & Optimization, 2021, 11 (2) : 321-332. doi: 10.3934/naco.2020028 |
[14] |
Lunji Song, Wenya Qi, Kaifang Liu, Qingxian Gu. A new over-penalized weak galerkin finite element method. Part Ⅱ: Elliptic interface problems. Discrete & Continuous Dynamical Systems - B, 2021, 26 (5) : 2581-2598. doi: 10.3934/dcdsb.2020196 |
[15] |
Kaifang Liu, Lunji Song, Shan Zhao. A new over-penalized weak galerkin method. Part Ⅰ: Second-order elliptic problems. Discrete & Continuous Dynamical Systems - B, 2021, 26 (5) : 2411-2428. doi: 10.3934/dcdsb.2020184 |
[16] |
Zemer Kosloff, Terry Soo. The orbital equivalence of Bernoulli actions and their Sinai factors. Journal of Modern Dynamics, 2021, 17: 145-182. doi: 10.3934/jmd.2021005 |
[17] |
Gheorghe Craciun, Abhishek Deshpande, Hyejin Jenny Yeon. Quasi-toric differential inclusions. Discrete & Continuous Dynamical Systems - B, 2021, 26 (5) : 2343-2359. doi: 10.3934/dcdsb.2020181 |
[18] |
Shanshan Chen, Junping Shi, Guohong Zhang. Spatial pattern formation in activator-inhibitor models with nonlocal dispersal. Discrete & Continuous Dynamical Systems - B, 2021, 26 (4) : 1843-1866. doi: 10.3934/dcdsb.2020042 |
[19] |
Israa Mohammed Khudher, Yahya Ismail Ibrahim, Suhaib Abduljabbar Altamir. Individual biometrics pattern based artificial image analysis techniques. Numerical Algebra, Control & Optimization, 2021 doi: 10.3934/naco.2020056 |
[20] |
Mats Gyllenberg, Jifa Jiang, Lei Niu, Ping Yan. On the classification of generalized competitive Atkinson-Allen models via the dynamics on the boundary of the carrying simplex. Discrete & Continuous Dynamical Systems - A, 2018, 38 (2) : 615-650. doi: 10.3934/dcds.2018027 |
2019 Impact Factor: 1.366
Tools
Article outline
Figures and Tables
[Back to Top]