July  2021, 17(4): 2277-2277. doi: 10.3934/jimo.2021064

Erratum

Computer Science Branch, Mathematics Department, Faculty of Science, Aswan University, Aswan, Egypt

Received  March 2021 Published  March 2021

Citation: M. R. Hassan. Erratum. Journal of Industrial & Management Optimization, 2021, 17 (4) : 2277-2277. doi: 10.3934/jimo.2021064
References:
[1]

M. R. Hassan, Maximizing reliability of the capacity vector for multi-source multi-sink stochastic-flow networks subject to an assignment budget, Journal of Industrial & Management Optimization, 17 (2021), 1253-1267.   Google Scholar

show all references

References:
[1]

M. R. Hassan, Maximizing reliability of the capacity vector for multi-source multi-sink stochastic-flow networks subject to an assignment budget, Journal of Industrial & Management Optimization, 17 (2021), 1253-1267.   Google Scholar

[1]

Freddy Dumortier, Robert Roussarie. Erratum. Discrete & Continuous Dynamical Systems, 2008, 22 (3) : 816-816. doi: 10.3934/dcds.2008.22.816

[2]

Zaihong Wang, Jin Li, Tiantian Ma. An erratum note on the paper: Positive periodic solution for Brillouin electron beam focusing system. Discrete & Continuous Dynamical Systems - B, 2013, 18 (7) : 1995-1997. doi: 10.3934/dcdsb.2013.18.1995

2019 Impact Factor: 1.366

Metrics

  • PDF downloads (16)
  • HTML views (35)
  • Cited by (0)

Other articles
by authors

[Back to Top]